ESE symbolESEEvent & Safety Engineering
02 — Our services02 / 06

Engineering / Studies / Calculations

Engineering
office

Calculate before you hang.

Key points

  1. 01
    StructuresLoads, ballast, anchoring
  2. 02
    DrawingsLayouts and schematics
  3. 03
    CalculationsNotes and justifications
Anticipate
Coordinate
Deliver

Drawings, schematics, studies and calculation notes: we produce the documents that validate a set-up before it is built. Structural calculation notes are checked and signed by a partner structural engineer.

Stage structures, suspended loads, trusses, towers, screens, grandstands: every element built on site must be justified. We model the configurations, calculate the forces and produce notes that inspection bodies, venue operators and suppliers can read.

The engineering office works upstream of a production or as one-off support: a calculation note for a rigging point, a layout for a safety commission, a schematic for a supplier.

When to call us

Typical situations

  1. 01A structure, truss or screen must be rigged and needs to be justified.
  2. 02The inspection body or safety commission asks for a drawing or a note.
  3. 03A supplier needs a clean schematic or layout.
  1. 01Calculation notes for structures and suspended loads (Braceworks, MVR).
  2. 02Load paths, ballast, anchoring and wind loading.
  3. 03Vectorworks layouts and technical drawings.
  4. 04Power, audio, video and network schematics (ConnectCAD).
  5. 05Feasibility studies and technical files for inspection bodies and commissions.
  6. 06Interface with structural engineers and inspection bodies.
  7. 07Calculation notes signed by a partner structural engineer.

Deliverables

What you receive

  • Calculation notes
  • Site layouts
  • Rigging plots
  • Schematics
  • Technical files
  • MVR files and 3D models

How we work

Four ways to bring us in

Request a quote →

No minimum budget. Reply within 2 working days.

Deliverables

Where we work

Calculation notesLayoutsRigging plotsSchematicsTechnical filesFeasibility studies3D modellingMVR files

In action

References

All references →
2025

Ninho

Stadium concerts · Stade de France · Stade Pierre-Mauroy · nearly 160,000 peopleLive technical direction · rigging · structures

2024

AC/DC Power Up Tour

Concert · Hippodrome de Longchamp · 80,000 peopleTechnical direction

ESE — Engineering & calculationsese-techsolutions.com →02 / 06

Contact

A project
to build?

A few lines are enough to start. Tell us what you are preparing, where you stand and the support you need.

Let's talk about your project →01 84 80 80 69 →