
Case study · R-04
Mylène Farmer
Nevermore
01Context
The last three dates of the Nevermore tour, at the Stade de France. Two shows cancelled in summer 2023 and moved to autumn 2024, plus an added date: the tour ends in Paris.
02The challenge
A full stadium production: work at height, cranes, assembly and lifting of structures and loads, pyrotechnics, flames and smoke during the show. Dozens of teams working side by side under one shared prevention plan.
03Our mission
Risk management technical direction: assessing the risks of the set-up, holding the joint prevention plan shared by every team, following co-activity, lifting and work at height, and keeping the stadium compliant and safe from load-in to the last night.


Contact
A stadium
tour?
A few lines are enough to start. Tell us what you are preparing, where you stand and the support you need.
